Little's Law calculator

Enter two of WIP, throughput and cycle time to find the third, with WIP reduction scenarios.

  • Delivery and flow
  • CKMS · domain 4
  • Free, no sign-up
  • PNG · PDF · Markdown · DOCX

See the finished result before you fill anything in.

Example with fictional data

See what the result looks like: Little's Law calculator

A made-up case, in the same format the tool delivers. Nothing you have filled in changes.

Average number of items started and not yet finished. Leave blank to calculate.

Average number of items finished per period. Leave blank to calculate.

Items finished per day or per week.

From the start of work to the delivery of each item. Leave blank to calculate.

Days or weeks.

Use the same basis the team uses to count cycle time.

A candidate limit: it is highlighted in the scenario table.

Result ready.

Little's Law calculatorPMCert

Little's Law

Average WIP = average throughput × average cycle time.

Work in progress
12 items
entered
Throughput
4 items per week
entered
Average cycle time
21 days
calculated

With 12 items in progress and a throughput of 4 items per week, each item takes on average 21 days from start to delivery.

Days and weeks converted with a week of 7 calendar days.

What happens if WIP goes down

WIPChange in WIPAverage cycle timeDifference per item
12 (current)0%21 days-
11-8%19.25 days-1.75 days
10-17%17.5 days-3.5 days
8 (your target)-33%14 days-7 days
7-42%12.25 days-8.75 days
6-50%10.5 days-10.5 days

With constant throughput, cycle time falls in the same proportion as WIP. In practice, reducing WIP tends to keep or even raise throughput (less context switching, less waiting), up to the point where people run out of work to pull.

Average cycle time by WIP

  • 12 (current)21 days
  • 1119.25 days
  • 1017.5 days
  • 8 (your target)14 days
  • 712.25 days
  • 610.5 days

Assumptions behind the calculation

  • A stable system: roughly as many items arrive as leave, and WIP does not keep growing or shrinking over the period.
  • Long-run averages measured over the same window (for example, the last 8 to 12 weeks), not a single day.
  • Every item that starts either finishes or is counted as discarded; a stalled item stays in WIP.
  • Consistent units: throughput and cycle time on the same day basis (calendar or working days).
  • The law describes system averages. To forecast the date for a batch of items, use the simulation-based delivery forecast.

Made at pmcert.org/tools

You can edit the result text before exporting.

Download
Share

Get this result by email

We send the result link and what domain 4 of CKMS assesses. You confirm the address before the first email and can leave with one click.

Nothing you type is saved on our server: your work stays in the page address and in this browser. Do not paste confidential data or personal data about customers.

Little's Law is a queueing theory relationship that holds for any stable system: average work in progress equals average throughput multiplied by average cycle time. In product and delivery teams, it shows why starting fewer things makes each item finish sooner: with the same throughput, less WIP means less waiting and a shorter cycle time.

How to use

  1. Fill in two of the three values: work in progress, throughput or average cycle time.
  2. Choose the units (items per day or per week; days or weeks) and whether a week has 7 calendar days or 5 working days.
  3. Read the calculated value and, if you fill in all three, the consistency check between them.
  4. Enter a WIP you want to test and compare the reduction scenarios in the table.
  5. Export the result or move on to the WIP limit simulator by column.

What each field asks for

FieldWhat to enter
Work in progress (WIP)Average number of items started and not yet finished. Leave blank to calculate.
ThroughputAverage number of items finished per period. Leave blank to calculate.
Throughput unitItems finished per day or per week.
Average cycle timeFrom the start of work to the delivery of each item. Leave blank to calculate.
Cycle time unitDays or weeks.
A week hasUse the same basis the team uses to count cycle time.
WIP you want to testA candidate limit: it is highlighted in the scenario table.

Example

A product team has on average 12 items in progress and finishes 4 items a week. By Little's Law, each item takes on average 3 weeks, or 21 calendar days, from start to delivery. The team wants to test a limit of 8 items: with the same throughput, the average cycle time falls to 14 days, 7 days less per item (one third). The table also shows the cuts in between: with 10 items, 17.5 days; with 6, 10.5 days.

When to use

  • To explain to the team or to leadership why starting less work makes deliveries come out sooner.
  • To estimate average cycle time when you only have counts of items in progress and items delivered.
  • Before setting WIP limits, to see how much cycle time could fall with each cut.
  • To check whether the board metrics are consistent with one another and whether the system is stable.

Frequently asked questions

What does Little's Law say?

That, in a stable system, average work in progress equals average throughput times average cycle time. With two values, the third follows. It holds for long-run averages, not for a single item.

Which units should I use?

Items for WIP, items per day or per week for throughput, and days or weeks for cycle time. The calculator converts units, but the day basis must match how the team measures: 7 calendar days or 5 working days per week.

Why doesn't the calculation match my data?

Usually because the system is not stable (WIP grew or shrank over the period) or because the figures come from different windows. Measure all three over the same period, ideally 8 to 12 weeks, and check again.

Does reducing WIP always reduce cycle time?

With the same throughput, yes, in the same proportion. In practice, throughput tends to hold or even rise with less WIP, because there is less context switching. The limit is the point where people run out of work to pull.

Can I use Little's Law to forecast a date?

It describes system averages and helps you understand flow. To answer when a batch of items will be done, with a probability, use the simulation-based delivery forecast built on historical throughput.

What counts as work in progress?

Every item that has started and has not yet been delivered, including items that are blocked or waiting for review. Leaving blocked items out underestimates WIP and makes cycle time look shorter than it is.